The attention of candidates is drawn to the fact that the building is subject to a study for the raising of the building. During these works, the kitchens and bathrooms of the dwellings will be renovated.
Visits scheduled at the bottom of the building on September 4 and 7, 2026 at 10:00 AM.
Visits scheduled at the bottom of the building on September 4 and 7, 2026 at 10:00 AM.