Located in a quiet area of Trélex, in a dead end, close to all amenities, this sober, elegant villa, on plan, will be perfect for a family with children.
Built on 4 levels, it will feature spacious living areas and offer optimal luminosity thanks to its large openings.
This architect-designed villa will feature top-of-the-range finishes, with noble materials.
Thanks to the minergie label, solar panels, and geo-cooling (underfloor cooling system), energy efficiency will be optimal.
This is a perfect home for a family!
Fllor distribution
Ground floor
First floor
Attic
Basement
The exteriors and highlights
Construction start: September 2024
Delivery: end of 2025
Consult us for more details
Built on 4 levels, it will feature spacious living areas and offer optimal luminosity thanks to its large openings.
This architect-designed villa will feature top-of-the-range finishes, with noble materials.
Thanks to the minergie label, solar panels, and geo-cooling (underfloor cooling system), energy efficiency will be optimal.
This is a perfect home for a family!
Fllor distribution
Ground floor
- Entrance with builtin cloakroom and guest toilet
- Open kitchen
- Living and dining room with terrace access and beautiful double height
- Bedroom with bathroom
- Study
- Shower room
First floor
- Main distribution hall
- Master bedroom
- Two bedrooms
- Two bathrooms
- Library or office of over or office over 20 sqm
- Balcony access of 14 sqm
Attic
- 38 sqm to convert, perfect as play area
Basement
- Technical room and pool technical room
- Storage room
- Laundry room
- Wine cellar (optional)
- Multi-purpose room to be used as a home cinema or fitness room
The exteriors and highlights
- Secure and quiet neighborhood
- Surrounded by forest which gives a bucolic feeling
- Landscaped garden
- Architect's villa
- Optional pool (permit in force)
- 3 minutes from the motorway
- Close to the train that connects to Nyon station in just a few minutes
- Moser private school just a few minutes away
- Shopping center nearby
- Energy efficiency, minergie label, solar panels and geo-cooling system
- Finish to choice of materials possible, budget on request
Construction start: September 2024
Delivery: end of 2025
Consult us for more details